Now showing items 1-1 of 1

    • Schultz, S. C. (Energy Systems Laboratory (http://esl.tamu.edu), 1996-04)
      In January 1994, 3M began the task of optimizing the electric motor systems at 3M Center, a 26 building, 7 million square foot corporate campus. A cross-functional, cross-company team was established which included four ...